Spaghetti — Construction Site Logistics
A morning on a 96-metre housing plot: a groundworker, a steel fixer and a labourer cover 855 m over 27 legs between the gate, the laydown area, the mixer and block C, with the store-to-skip haul walked four times.
Make it your own.
title "Plot 4 groundworks — week 6 site logistics"
scale 1m = 8px
room "Plot 4" 96m x 62m
zone "Welfare compound" at 4,4 size 16x12
zone "Material laydown" at 6,42 size 22x16
zone "Work face — block C" at 56,20 size 32x26
station Gate at 2,32
station Welfare at 12,10
station Store at 16,50
station Mixer at 34,44
station "Rebar bay" at 30,14
station Hoist at 58,34
station "Block C L1" at 70,26
station "Block C L2" at 78,40
station Skip at 44,56
path "Groundworker" : Welfare -> Store -> Mixer -> "Block C L1" -> Mixer -> "Block C L1" -> Skip -> Store -> "Block C L1" -> Welfare
path "Steel fixer" colour: red : Welfare -> "Rebar bay" -> Hoist -> "Block C L2" -> Hoist -> "Rebar bay" -> "Block C L2" -> Hoist -> "Rebar bay" -> Welfare
path "Labourer" colour: amber : Gate -> Store -> Skip -> Store -> Mixer -> Skip -> Store -> Gate -> Welfare -> Store