Construction WBS
Work breakdown for a small commercial build project.
Rendering…
Make it your own.
digraph wbs {
rankdir=TB;
graph [bgcolor=transparent];
node [shape=box, style="rounded,filled", fontname=Inter, fontsize=10];
Proj [label="1. Commercial Building", fillcolor="#fce7f3"];
P1 [label="1.1 Preconstruction"]; P2 [label="1.2 Site"]; P3 [label="1.3 Structure"];
P4 [label="1.4 Envelope"]; P5 [label="1.5 MEP"]; P6 [label="1.6 Interior"];
P7 [label="1.7 Closeout"];
P1a [label="Design + permits"];
P2a [label="Survey + demo"]; P2b [label="Excavation"]; P2c [label="Utilities"];
P3a [label="Foundation"]; P3b [label="Steel frame"]; P3c [label="Slabs"];
P4a [label="Curtain wall"]; P4b [label="Roof"];
P5a [label="HVAC"]; P5b [label="Plumbing"]; P5c [label="Electrical"];
P6a [label="Drywall + paint"]; P6b [label="Floors"]; P6c [label="Fixtures"];
P7a [label="Commissioning"]; P7b [label="Punch list"];
Proj -> P1 -> P1a;
Proj -> P2; P2 -> P2a; P2 -> P2b; P2 -> P2c;
Proj -> P3; P3 -> P3a; P3 -> P3b; P3 -> P3c;
Proj -> P4; P4 -> P4a; P4 -> P4b;
Proj -> P5; P5 -> P5a; P5 -> P5b; P5 -> P5c;
Proj -> P6; P6 -> P6a; P6 -> P6b; P6 -> P6c;
Proj -> P7; P7 -> P7a; P7 -> P7b;
}