Bullet Graphs — OEE and Its Three Factors, Packaging Line

Overall equipment effectiveness for a packaging line over a week, with its three factors against target: availability 86.0% × performance 91.5% × quality 98.4% = OEE 77.4%, short of the 85% world-class benchmark. Bands are poor / acceptable / good; the factors multiply, so the weakest one — availability — is where the minutes are. Illustrative values.

Template previewBullet / KPI
Packaging line 3 — OEE week 32 (%, illustrative)OEE77.4 / 85Availability86 / 90Performance91.5 / 95Quality (first pass)98.4 / 99

Make it your own.

title "Packaging line 3 — OEE week 32 (%, illustrative)"
# OEE = availability × performance × quality = 0.860 × 0.915 × 0.984 = 0.774
metric "OEE" value 77.4 target 85 max 100 ranges 60,75,100
metric "Availability" value 86 target 90 max 100 ranges 80,88,100
metric "Performance" value 91.5 target 95 max 100 ranges 85,92,100
metric "Quality (first pass)" value 98.4 target 99 max 100 ranges 97,98.5,100