RBD — Potable Water Pumping Station

Annual availability of a district pumping station with a two-of-three duty pump set, showing the 11 kV incomer as the weakest block on site and the rising main as an unavoidable series element.

Template previewReliability block diagram
District pumping station — raw water to service reservoirMission 8 760 h · 1.00 yr · 11 blocks · 3 redundant arrangements · R 0.093326parallel · R 0.22117411 kV incomerR 0.185516 · A 0.99904Standby diesel gensetR 0.043780 · A 0.99361Motor control centreR 0.960964 · A 0.99996parallel · R 0.964559Variable speed drive AR 0.811743 · A 0.99986Variable speed drive BR 0.811743 · A 0.999862 of 3 · R 0.552234Duty pump 1R 0.534879 · A 0.99829Duty pump 2R 0.534879 · A 0.99829Duty pump 3R 0.534879 · A 0.99829Surge vesselR 0.952499 · A 0.99980Rising main to reservoirR 0.990314 · A 0.99981Telemetry outstationR 0.873918 · A 0.99994System reliability0.093326Unreliability0.9067System MTTF4 343 h · 181 dAvailability0.999501Reliability importance — Birnbaum ∂R/∂Rᵢ, with criticality share111 kV incomer0.403482crit 36%2Standby diesel genset0.343676crit 36%3Telemetry outstation0.106790crit 1.49%4Surge vessel0.097980crit 0.51%5Motor control centre0.097117crit 0.42%6Rising main to reservoir0.094239crit 0.10%7Duty pump 10.084087crit 4.31%8Duty pump 20.084087crit 4.31%+3 more blocks not shownIdle redundancy: Standby diesel genset in the parallel group is not buying anything — take it out and the group itself is only 4.6% more likely to fail, and the system 1.50e-2 less reliable. That is redundancy you are paying to maintain and are not being paid for.…Weakest link: 11 kV incomer — R 0.185516, Birnbaum 0.403482, 36% of system failure. Improving this one block moves the system number further than improving any other.

Make it your own.

title "District pumping station — raw water to service reservoir"
mission 8760h

# Repair times are what they actually are on this site: a pump swap is a
# day, a rising main burst is a road closure and a week of reinstatement.
block mains     "11 kV incomer"            mtbf: 5200h    mttr: 5h
block genset    "Standby diesel genset"    mtbf: 2800h    mttr: 18h
block mcc       "Motor control centre"     mtbf: 220000h  mttr: 8h
block pump1     "Duty pump 1"              mtbf: 14000h   mttr: 24h
block pump2     "Duty pump 2"              mtbf: 14000h   mttr: 24h
block pump3     "Duty pump 3"              mtbf: 14000h   mttr: 24h
block vsdA      "Variable speed drive A"   mtbf: 42000h   mttr: 6h
block vsdB      "Variable speed drive B"   mtbf: 42000h   mttr: 6h
block surge     "Surge vessel"             mtbf: 180000h  mttr: 36h
block main      "Rising main to reservoir" mtbf: 900000h  mttr: 168h
block telemetry "Telemetry outstation"     mtbf: 65000h   mttr: 4h

series {
  parallel { mains; genset }
  mcc
  parallel { vsdA; vsdB }
  kofn 2 of 3 { pump1; pump2; pump3 }
  surge
  main
  telemetry
}