RBD — Data-Centre Power Train
Utility feed backed by a cold-standby generator pair, 2N UPS strings and 2-of-3 PDUs, computing annual system reliability, MTTF and availability for the rack busway.
Make it your own.
title "Concurrently maintainable data-centre power train"
mission 8760h
# The utility feed is by far the weakest element — a few outages a year is
# normal, which is exactly why the generator path exists.
block grid "Utility 11 kV feed" mtbf: 4300h mttr: 4h
block ats "Automatic transfer switch" mtbf: 180000h mttr: 6h
block dgA "Diesel generator A" rate: 2.4e-4 /h mttr: 12h
block dgB "Diesel generator B" rate: 2.4e-4 /h mttr: 12h
block upsA "UPS string A" mtbf: 120000h mttr: 4h
block upsB "UPS string B" mtbf: 120000h mttr: 4h
block pdu1 "PDU 1" mtbf: 260000h mttr: 3h
block pdu2 "PDU 2" mtbf: 260000h mttr: 3h
block pdu3 "PDU 3" mtbf: 260000h mttr: 3h
block busway "Busway to rack" mtbf: 900000h mttr: 8h
series {
parallel {
grid
series { ats; standby cold { primary: dgA; spare: dgB; switch: 0.995 } }
}
parallel { upsA; upsB }
kofn 2 of 3 { pdu1; pdu2; pdu3 }
busway
}