RBD — Subsea Multiphase Boosting Station
Six-month intervention window for a subsea boosting station: shared umbilical, dual control modules and two full VSD-plus-pump trains, with repair times set by vessel mobilisation.
Make it your own.
title "Subsea multiphase boosting station"
mission 4380h # six months between intervention windows
# MTTRs are dominated by vessel mobilisation, not by the repair itself —
# 1440 h is sixty days waiting on weather and a light well intervention.
block umbilical "Power / control umbilical" mtbf: 190000h mttr: 720h
block scmA "Subsea control module A" mtbf: 90000h mttr: 480h
block scmB "Subsea control module B" mtbf: 90000h mttr: 480h
block vsdA "Topside VSD A" mtbf: 45000h mttr: 12h
block vsdB "Topside VSD B" mtbf: 45000h mttr: 12h
block pumpA "Boosting pump A" mtbf: 26000h mttr: 1440h
block pumpB "Boosting pump B" mtbf: 26000h mttr: 1440h
block barrier "Barrier fluid system" mtbf: 60000h mttr: 240h
block flowline "Production flowline" mtbf: 2000000h mttr: 2160h
series {
umbilical
parallel { scmA; scmB }
parallel {
series { vsdA; pumpA }
series { vsdB; pumpB }
}
barrier
flowline
}