Asset commissioning and defect closure
Preserves hold points and distinguishes physical installation from operational acceptance. Original worked design example; adapt responsibilities, thresholds and assumptions to your system.
Rendering…
What this template contains
- Diagram type
- State diagram
- Source
- 14 lines
Make it your own.
stateDiagram-v2
[*] --> Installed
Installed --> Prechecks: verify completion dossier
Prechecks --> DefectOpen: missing or failed check
DefectOpen --> Repair: assign corrective action
Repair --> Prechecks: evidence resubmitted
Prechecks --> EnergizationApproved: prerequisites accepted
EnergizationApproved --> FunctionalTest: controlled activation
FunctionalTest --> DefectOpen: performance failure
FunctionalTest --> TrialOperation: acceptance criteria met
TrialOperation --> FunctionalTest: instability detected
TrialOperation --> Handover: stable duty demonstrated
Handover --> Operational: owner accepts records
Operational --> [*]