Pareto — Rail Delay Minutes by Cause
Delay minutes attributed by cause across a commuter route's autumn period against the spring one, computing that 5 of 11 causes carry 80.9% of 34,500 minutes and that leaf-fall adhesion displaced signalling power supply from the vital few.
Make it your own.
title "Delay minutes by attributed cause — Anglia commuter route"
unit delay minutes
period "Autumn period 7"
compare "Spring period 2"
threshold 80%
other-below 2%
note "Delay attributed to the infrastructure manager and the operator combined"
# cause Autumn Spring
"Track circuit failure" 8420 7610
"Trespass and cable theft" 6180 5240
"Adhesion and railhead treatment" 5940 410
"Points failure" 4120 4480
"Fleet door and traction faults" 3260 3890
"Signalling power supply" 1980 2140
"Overhead line dewirement" 1470 1620
"Passenger taken ill" 1210 1180
"Bridge strike" 860 940
"Level crossing misuse" 640 710
"Staff unavailable" 420 880